About
Eastern Asphalt has made a significant investment in the latest Batch Plant technology and control systems.
The plant utilises the most modern computer controlled systems to accurately monitor each phase of its production process to ensure each batch of asphalt strictly adheres to its design properties.
Eastern Asphalt Plant uses the most modern environmental controls to produce a more environmentally friendly product:
- The plant uses carbon activated capture units to effectively filter out any odours produced by the manufacturing process.
- All dust is captured during the manufacturing process by a large bag house unit
- Liquefied Natural Gas, which is a more pure form of Natural Gas is used to dry all components used in the manufacturing of its asphalt products.
80 tonne per hour capacity, backed by hot storage surge bins – allows us to boost capacity and produce various / multiple asphalt types on the run
The plant is equipped with 2 hot storage bins which hold 50 tonne of material each that can store hot asphalt for a period of up to 2 days allowing the plant to make a number of different products to service clients requiring different products around the same time.
Strategically placed to service, East Gippsland and Southern New South Wales - Eastern Asphalt is located in Bairnsdale Victoria.
Production of durable and hard wearing asphalt products for use in all road making scenarios.
Asphalt is produced using aggregates meeting VicRoads Class A specification.
Aggregate used has a PSV of 63 making it effective in areas where high levels of skid resistance are required.
Products produced are Nata tested ensuring compliance to specifications